Off-plan in Bali: how to protect your money
Investing in a villa that does not exist yet carries risks. Here is what they are and how a payment plan tied to construction reduces them.
"Off-plan" means investing in a villa before it is finished. You reserve it on paper and pay as construction progresses. It is a common arrangement in Bali, because it lets you fix a price today, but it has an obvious risk: paying for something that does not yet exist. So the right question is not "is it safe?" but "how is my money protected while they build?".
- The main risk of off-plan is paying in advance for work not yet built.
- The remedy is to tie every payment to a construction milestone that is completed and documented.
- With us: 10% on reservation, 20% on contracts, 70% by milestones, over about a year of works.
- A notary you choose checks the land, permits and debts before you sign.
What investing off-plan means
When you choose a villa under construction, you reserve a unit based on floor plans, renders and commitments. You receive the villa only at handover, and until then it produces no income: the yields in our model refer to the villa finished and under management, not to the construction period.
The advantage is fixing the price and choosing the unit before the project is complete. The price of that advantage is construction risk, which can be reduced but not eliminated.
The risks, plainly
- Delays in handover, or no clear date.
- A villa different from the one promised: finishes, furniture or sizes different from the offer.
- A weak builder, or one without a verifiable track record.
- Land or a permit that does not hold up: the wrong zone, an invalid building permit, debts or disputes on the land.
- Advance payments with no link to what has been built.
These are general off-plan risks, in Bali and elsewhere. Each one has a countermeasure: let us go through them.
How milestone payments protect you
The payment plan follows the construction site, not the calendar. No advance lump sums, no surprises: payments are spread over about a year of works.
| Stage | When | Payment |
|---|---|---|
| 1 · Reservation: secures the villa and the price | Immediately | 10% |
| 2 · Contracts signed, notary checks | ~4 weeks | 20% |
| 3 · Foundations completed | Construction | 15% |
| 4 · Structure completed | Construction | 20% |
| 5 · Roof and waterproofing | Construction | 10% |
| 6 · Systems and finishes | Construction | 15% |
| 7 · Final inspection and handover | Handover | 10% |
In summary: 10% on reservation, 20% when the contracts are signed and 70% by construction milestones. You pay at each stage once it is completed and checked. Every milestone is documented with photos before the next payment falls due: your money follows the construction, never the other way round.
The deposit: what protects it
The 10% deposit takes the villa off the market and locks the price, with a signed reservation agreement. It is the agreement that sets out your withdrawal and refund rights: read it carefully before signing, and ask in writing what happens if you change your mind or if the conditions are not met.
The notary: the check before you sign
Before you sign the contracts, a notary you choose carries out due diligence:
- checks the land certificate and the title holder;
- checks the zoning on the official map;
- confirms the building permit (PBG) is valid;
- checks taxes and that there are no debts;
- drafts and reviews the sale and lease contracts;
- registers the transaction with the land office.
You choose the notary: you can use the one suggested by Zenava, appoint your own or ask us for a shortlist of names. The fee is standard in Bali, around 1% of the price, and is paid directly to the notary.
What to ask the builder
- Has the land already been secured? For Zenava Villas and Villa Sereno, two plots in Kerobokan, Canggu area, already held in leasehold: no promises about land still to be found.
- Who builds, and for how long have they been doing it? Our villas are built by LEXIO Construction, a company with over 40 years of experience in Bali, with local consultants for permits.
- Is there a written list of finishes, furniture and warranties? In the three-bedroom villas furniture is included; for Villa Sereno it is optional and quoted separately.
- Which milestone unlocks which payment, and how is it documented?
- What happens if the timeline slips? Ask, and get the answer in writing: final prices, sizes and timelines are confirmed on reservation.
- How are you kept updated during the works? With photos and videos of progress.
The full list of points to check is in the checklist.
A note of honesty
Zenava Villas and Villa Sereno are our first projects. We cannot show you twenty years of projects: we can show you who we are, what we already have in hand and how we protect you. That is why we built every step to safeguard you: a notary of your choice, payments by documented milestones, costs shown in full and cautious assumptions. Judge us on that, and run your own checks with whoever you like.
If you are not in Bali
You do not need to be there to follow an off-plan build: you can sign remotely with a notarised power of attorney and receive photos and videos of progress. How it works: Buying a villa in Bali remotely. And to understand what happens after handover, and what the villa can yield: What a villa in Bali really yields.
Frequently asked questions
What is an off-plan purchase?
It is buying a villa before it is finished: you reserve the unit based on the project and pay as construction progresses, up to handover.
How much do I have to pay up front?
10% on reservation, which locks the villa and the price. 20% is paid when the contracts are signed, after the notary's checks; 70% by construction milestones.
What protects my deposit?
The signed reservation agreement, which sets out your withdrawal and refund rights. Read it carefully before signing.
How do I know a milestone has really been reached?
Every milestone is documented with photos before the next payment falls due, and the plan ties each instalment to a completed construction stage.
Does the villa produce income during construction?
No: income starts when the villa is finished and handed over. From then on it is managed by Zenava Manage, together with a licensed operator.
Want to see the payment plan for your villa?
Get the floor plans, availability and full model, and go through milestones, amounts and timelines with us.
Leave your detailsThis article is for information only and is not legal, tax or financial advice. Villas, floor plans, sizes, finishes, timelines and prices are indicative and depend on design, surveys, calculations and permits; final prices and sizes are confirmed on reservation. Before deciding, speak to an Indonesian notary or lawyer and to qualified advisors in your own country. Read the full disclaimer.